HJS Awarded Largest Tynetec Warden Call Upgrade

We are proud to have been awarded  a warden call installation tender with Nuneaton and Bedworth council.

In a competitive tender HJS were succesfulll in being awarded 38 residential warden call blocks to be upgraded with the latest Tynetec XT2 system, installing new wiring and containment whilst stripping out the old system. 

The 12 month contract is the largest multiple warden call site to be done with Tynetec and involved detailed planning and co-ordination, allowing us to keep the existing system working up until the Tynetec system could be switched over and be operational, without a loss of service.